CCjon
All who wander... seeking fresh cup of coffee
- Joined
- Aug 24, 2017
- Messages
- 171
- Location
- Cypress, Texas
- Ride
- 2018 Honda Goldwing / Hannigan sidecar
Finally getting back to Project Warthog. The Texas Sidecar Company finished their part in the re-working the bike subframe and struts so I could transfer the side camper from the Vstrom1000 to the R3. Brought the rig home, now to work on wring, mounting the various bits and pieces to make atop notch adventure rig.
Looking at the photos you will note lots a little changes to the basic bike to make it more road-worthy and suited for sidecar duty.
Yes, it is going to be a W-I-D-E rig, which will make it more stable.
Fabricating a top rack for the five gallon auxiliary fuel cell and top box.
The rear top rack also supports the left pannier rack.
Now am waiting for a new fuel pump plate and arm as the OEM was corroding, flaking rust. The main tank itself was fine though. A new seat is being made for all day riding.
Am planning a return ride to Alaska next summer. Saving on the cost of motels allows better eating and buying more fuel.
More photos to follow as the build project winds up and the riding begins....
Looking at the photos you will note lots a little changes to the basic bike to make it more road-worthy and suited for sidecar duty.
Yes, it is going to be a W-I-D-E rig, which will make it more stable.
Fabricating a top rack for the five gallon auxiliary fuel cell and top box.
The rear top rack also supports the left pannier rack.
Now am waiting for a new fuel pump plate and arm as the OEM was corroding, flaking rust. The main tank itself was fine though. A new seat is being made for all day riding.
Am planning a return ride to Alaska next summer. Saving on the cost of motels allows better eating and buying more fuel.
More photos to follow as the build project winds up and the riding begins....