rng3
"There is no replacement for displacement"
- Joined
- May 8, 2018
- Messages
- 420
- Location
- Chester county, West of Philadelpha
- Ride
- Rocket 3 roadster 2017
I think you both are also.
The set screw is at one end of the shaft, the TPS is at the other with the adjuster's screws to balance the TB in the middle.
So if you start by balancing the TB's, then set the TPS for full stop .60 volts ? The next step in Tune ECU is to set that screw for the higher voltage .72 ? Not sure of the voltages no notes here.
Then the 12 minute tune so the ECU can establish the park position for the stepper motor.
Also look at the ignition timing between the different timing tables.
When I added timing the bike would first idle at 1200 then slow to 850 as the stepper adjusted.
After 12 minute tune all was well.
Rick
The set screw is at one end of the shaft, the TPS is at the other with the adjuster's screws to balance the TB in the middle.
So if you start by balancing the TB's, then set the TPS for full stop .60 volts ? The next step in Tune ECU is to set that screw for the higher voltage .72 ? Not sure of the voltages no notes here.
Then the 12 minute tune so the ECU can establish the park position for the stepper motor.
Also look at the ignition timing between the different timing tables.
When I added timing the bike would first idle at 1200 then slow to 850 as the stepper adjusted.
After 12 minute tune all was well.
Rick