Bob R
Living Legend
Well, it seems as though winter has finally moved in. My riding is probably done for a few months, so it is time to do things.
The things I have planned for the R3 is
1. Tors
2. Replace the stock seat with a 2 piece long haul
3. Kuryaken ISo with throttle boss
4. Garmin ecoRoute to use with my phone
5. Fabricate some rubber washers so my driving lights will stay put.
This should take less than a day, so then what?
bob
The things I have planned for the R3 is
1. Tors
2. Replace the stock seat with a 2 piece long haul
3. Kuryaken ISo with throttle boss
4. Garmin ecoRoute to use with my phone
5. Fabricate some rubber washers so my driving lights will stay put.
This should take less than a day, so then what?
bob